CN EN
ONE-STOP SMART MANUFACTURING FOR EC FAN COMPLETE UNITS
| HVAC ENERGY RETROFIT SPECIALIST
EC-Fans · EC-Fan-Boxes · EC-Fan-Walls · Industrial-Fan · Permanent-Magnet-Synchronous-Motors
National Hotline
+86 156-7777-5739
Cases
Featured
New Energy
Semiconductor
Photovoltaic
Pharmaceutical
Chemical
Large Public Places
News
Key recommendations
Company News
Cultural Stories
Media Reports
Brand Activities
About Eblue
View EBLUE development
Focus on Energy-saving Technology Innovation
Innovation in EBLUE
Entrepreneurs Taking Strivers as the Foundation
Win-win with EBLUE
Build an Efficient Energy-saving Equipment Manufacturer Together
Independent temperature control & speed regulation retrofit solution
One-stop comprehensive solution for semiconductor material exhaust treatment
Home Solutions AHU EC Fan Energy-saving Retrofit Independent temperature control & speed regulation retrofit solution
Programmatic summarize
Semiconductor material exhaust treatment solution
Sources of Semiconductor Material Exhaust
Polar plate engineering: mixing and pulping, coating and baking, roller slitting, laser die-cutting and slitting.
Assembly works: Winding, JR preheating short circuit testing, pairing, welding, vacuum drying
Formation engineering: liquid injection, high-temperature static, formation, welding, battery charging and discharging, aging test, laminating
included among these,A large amount of NMP exhaust is generated during the mixing and pulping and coating processes in the polar plate engineering.
Distributed exhaust gas transfer type purification system
The value of the program runs through the entire life cycle, and is committed to improving purification capacity, controlling equipment life, and efficient and accurate operation and maintenance.
工艺包渲染流程图
系统特性(解决痛点)
Adjustable operating functions, multimode combination
Compact assembly process, easy to build
Dynamic design of modules, on-demand additions
Highly efficient and economical equipment to reduce costs and increase efficiency
应用场景
Concentration: <25 % LEL (less than 25% of the lower explosive limit)
Component: Mixed exhaust gas, suitable for treatment of medium air volume, containing a certain concentration of organic exhaust gas
Industry: lithium battery production and recycling, new energy, electronics, chemical, petrochemical, etc.
Efficiency: can be stabilized at more than 99%
Device Rendering
Device Rendering
Device Rendering
Device Rendering
Device Rendering
Service Configuration
Provide a complete set of our own solutions based on customer needs and project characteristics, and introduce mature cases that fit a wide range of needs.
Exclusive Team
Preferred senior business and technical teams, along with specialists, accompany the entire process to achieve efficient pre-sale communication and after-sales service, reducing obstructive closed-loop operations.
Customized Solution
By utilizing a collaborative approach in each case and discussion, we are able to effectively deliver tailored solutions that meet the demands of any working condition. From initial demand analysis to system integration design, our solutions offer both technical reliability and economic rationality.
Economic Calculation
We conduct full-site construction planning for energy-saving retrofits, perform investment & operation-level cost-benefit calculation, build dynamic financial models and support manual analytical adjustment. We deliver supporting economic benefit evaluation and complete reliable project economic feasibility demonstration.
Kit Delivery
The turnkey package delivery covers the entire design and development process, manufacturing, commissioning, and management of operation and maintenance. This approach ensures a comprehensive delivery and a cost-effective solution.
Program Process Kits
Modular dynamic design, multi-mode combination, on-demand additions
AHU EC Fan Energy-Saving Retrofit

• Replace traditional belt-driven fans with permanent magnet EC fans, achieving 30%-60% power saving

• Belt-free design eliminates belt maintenance and reduces long-term O&M costs

• Intelligent stepless speed regulation, air supply on demand, adaptable to variable load conditions

• Lower vibration and noise to guarantee stable operating conditions for clean rooms

• One-stop retrofit to minimize production downtime

EC Fan Box Energy-Saving Retrofit

• Permanent magnet direct-drive EC fan box, no transmission loss, 30%-55% energy saving

• Modular integrated retrofit, compatible with upgrade of various old HVAC systems

• No frequent maintenance, greatly reducing subsequent equipment maintenance costs

• Intelligent on-demand speed regulation, stable air pressure & airflow, optimized ventilation conditions

• Low noise and low vibration operation, suitable for precision workshops and computer room scenarios

Engineering Management Advantage
Experience in the development, design and construction of multi-million waste gas treatment projects, with sound management mechanism
Dedicated and professional
We have a highly competent engineering management team with extensive experience in energy-saving retrofit projects. The team is capable of tackling tough challenges and resolving complex construction issues. Our business covers typical industries including petroleum refining, data centers, lithium battery workshops, lithium battery recycling workshops, photovoltaic cell workshops, hydrogen fuel cell workshops, semiconductor manufacturing workshops and new energy vehicles.
Timely handling
The ideal management system can promptly address unforeseen and unique incidents at the project site. By creating an intelligent, real-time production monitoring and maintenance platform, the project can achieve "centralized monitoring, regional maintenance, unmanned and minimally manned, intelligent, and professional operation and maintenance" while maximizing the advantages of smart operation and maintenance response.
Service Guarantee
The engineering project management team values the owner's experience, proactively communicates and coordinates with them on a regular basis, and promptly responds to their suggestions and requirements. By relying on the company's engineering project management system, specifications, and quantitative metrics, the team can offer customers post-operation and maintenance services that are both efficient and of high quality. Our team continuously strives to enhance customer satisfaction.
Related Products
Robust and reliable, quality assurance, technology-led, efficient purification
EC Centrifugal Fan
Shanghai EBLUE Energy Saving EC centrifugal fans adopt permanent magnet direct-drive brushless motors to eliminate belt transmission loss and support 0-10V/PWM intelligent stepless speed regulation. With low noise, low failure rate and maintenance-free operation for 24-hour continuous running, they connect to BA and environment monitoring systems. Widely used for HVAC upgrades of air handling units, fan boxes, industrial ventilation and clean workshops, we provide one-stop EC centrifugal fan energy-saving retrofit solutions.
01
Inner‑Rotor Permanent‑Magnet Synchronous Motor
EBLUE Energy Saving inner‑rotor permanent‑magnet synchronous motor adopts classic outer‑stator & inner‑rotor structure with excellent heat dissipation and good temperature‑rise control. It can be equipped with surface‑mounted or interior magnetic circuits for medium‑and‑high‑power working conditions. Matched with EC intelligent drive module, it supports 0‑10V/PWM speed regulation and connects to BA building automation and environmental monitoring systems. The exposed output shaft enables easy installation. Widely applied for fan boxes, large‑size fans, fan walls, HVAC‑AC and data‑center cooling equipment.
02
Air‑Handling Unit EC Fan Energy‑Saving Retrofit
EBLUE Energy‑Saving AHU EC fan retrofit replaces traditional belt‑driven asynchronous fans with EC permanent‑magnet direct‑drive fan modules to eliminate belt transmission loss. It supports 0‑10V/PWM stepless speed regulation and BA building automation connection. With precisely dynamically‑balanced impeller, low vibration and low noise, it requires little frequent maintenance. Suitable for central AHU upgrade of commercial buildings, factories, clean workshops and hospitals, achieving 30‑60% comprehensive power saving.
03
Related Cases
Semiconductor Material Exhaust Gas Treatment + Full Scenario Solution for Industry Workshop
Chat
Online
400-021-1559